All about Pavers

Most paver projects will vary depending on access, site conditions, project size and of course, the weather. These situations can have an overall impact on your project from a timing stand point. Careful consideration should be taken to determine the time to start the paver installation. Always try to minimize or avoid any traffic on the prepared areas.

 

The foreman or project manager should always have the materials (sand / pavers) distributed around the project site for easy and efficient installations. Paver pallets/bundles should be placed in a manner not to interfere with the paver installation. The proper pallet/bundle placement can make the actual project installation easier and quicker by reducing the overall labor of handling the material.You may want to check out Pavers for more.

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Brick paver patterns

Pavers can be placed in many different patterns depending on their shape. Each paver shape will generally have several different hatch patterns that are provided by the manufacturer.

 

The laying pattern and shape of the paver is very critical to the performance of the application. Contractors need to take into consideration the traffic weight loads on their paver projects. 90 or 45 degree herringbone patterns are recommended in all street and driveway applications, as these patterns will provide the maximum load support needed and will resist creeping from the turning of tires and starting or braking of vehicular traffic. In most applications worldwide, it has been shown that pavers laid in a herringbone pattern have performed adequately.

 

Pavers that are 60 mm (2 - 3/8 in) thickness are suitable for pedestrian applications. Pavers that are going to be used in commercial or industrial applications should be 80 mm (3 - 1/8 in) in thickness.

 

Reference/starting point for brick paver installation

There are a number of conditions that determine the starting point of a paver project. When starting to install pavers it is best to snap a true straight chalk line on the surface of the bedding sand or pull a true straight string line above the surface of the bedding sand at the finished elevation of the pavers. This will help as a guide for maintaining straight joint lines and will also allow the installer to make adjustments in the alignment of the pavers.

 

Buildings and concrete curbing are generally not straight and should not be used for establishing straight joint lines. The use of string lines is essential to determine the true straightness of the edge as well. As the paver installation progresses, the string lines will help minimize the need for small trim pieces.

 

Joint width between pavers should be between 1/16 and 3/16 in (2 and 5 mm ). There are some pavers with spacer bars on their sides. These will maintain a minimum joint width and allow the bedding and jointing sand to enter between each paver. Pavers with spacer bars are generally not laid in snug against each other since a string line will provide consistent joint spacing.